Explore product-specific spaces to ask questions, share insights, and learn best practices.
Recently active
Please expose the Expense object type (EXPENSE / objCode: EXPNS) via the Workffont Claude connector, including fields such as description, amount, actualAmount, expenseType, plannedDate, billingRecordID, and projectID — this would allow us to pull full financial breakdowns programmatically rather than having to access the Workfront UI manually.Second, we need the ability to create and update Notes/Updates on projects and tasks via the connector — specifically, support for the Note object type with create and update operations, so we can post weekly status updates, comments, and log changes directly from the AI assistant without switching to the Workfront interface.
We are going to be relying heavily on the MCP connections so being able to have visibility of their status is key. Can you please check if their status can be included on the adobe status page.
We would like the option to customize standard and event emails in Workfront, similar to how reminder emails can be personalized. This would include editing the subject, body, and HTML, not just the subject line.
Add the ability to pin or favorite linked SharePoint files or folders within Workfront (Documents area) to enable quicker access to frequently used external items, improving efficiency within the Workfront–SharePoint integration.
Current BehaviorThere is no auto-number or sequential ID field available when configuring a Planning record type. Unique identifiers must be entered manually or generated externally and written back via automation.Desired BehaviorA native auto-number field type in Workfront Planning, with configuration options for:Number of digits (e.g. zero-padded to 5 digits: 00001) Format: numeric only, alphanumeric, sequential, or random Optional prefix and/or suffix (e.g. NRD-00001 or 00001-PRINT) Starting count (configurable, not locked to 1)The field value would be system-generated on record creation and read-only after assignment.Business ImpactAuto-generated sequential identifiers are a baseline requirement for any operational record-keeping use case — job ticketing, production requests, vendor orders. Without this, teams either maintain a manual counter (error-prone, breaks under concurrent edits) or build a Fusion scenario to replicate what should be a native field configuration. We’ve encou
When using Global record types to aggregate data from regional workspaces into a central, leadership-facing workspace, there is a consistent need to tailor field visibility at the workspace level. Specifically, certain fields that are relevant in the global context are not always appropriate for display in inherited regional workspaces.When using Global record types across inherited regional workspaces, admins need consistent control over which fields are visible to users.Today, fields can be hidden in Table view and the associated record detail panel, but Timeline view does not respect these visibility settings. Instead, the Timeline detail panel displays all fields by default, creating an inconsistent experience and exposing unnecessary fields to end users.The “Show all fields” toggle already exists in the Timeline detail view, but it is disabled and not configurable.Suggested enhancement:Enable the existing toggle in Timeline view Allow it to respect field visibility defined in Tabl
When using Tab or Accordion components in a page, an issue occurs where, after editing a component on the second or subsequent pages and then closing it, the view unintentionally returns to the first page.Expected behavior: When editing components on the second or subsequent pages, the user should remain on the edited page and be able to continue working without being redirected to the first page.
At this time, there doesn’t seem to be any good options for copying Report Builder requests from one file to another. There is a Copy / Paste request option built into the Add-On which is amazing, but this only works within the same file. You cannot copy a request from one file into another. I tested this by opening and logging into two Excel Reports, copying a simple request from Report A, then going into Report B and selecting a cell… there was no Paste option available. I can understand that this might be an Add-On scope issue, but what about adding an Export / Import function that can export out an XML or JSON formatted file that can then be imported into another Excel instance… and hopefully this would support bulk rules and not just one at a time, as this would make merging reports into one large report so much easier (than the current “rebuild all requests from scratch”). This feature would be a huge time saver to:make copies of common requests to other files merging reports tog
Description - Proof Deadline Date should not be blanked out on the most recently activated stage when the "Workfront stage" is added to the WorkflowWhy is this feature important to you - Reviewers are not seeing these proofs appear on their report and are missing proof deadlines.How would you like the feature to work - When a "Workfront stage" is added, it should not change/blank out a Proof Deadline Date in the recently activated stage. The Proof Deadline Date should retain.Current Behaviour -Proof Deadline Date is blanked out on the most recently activated stage when the "Workfront stage" is added to the Workflow This is related to:a ticket we have opened with Adobe Support: 00415119 [WORKFLOW-2900] Issue: Sync with Compliance Catalog is Blanking out Proof Deadline Date - Jira (atlassian.net)
Contributor licenses have considerably less restrictions than light licenses and allows our company to partner with some of our external partners on marketing campaigns without having to spend the resources to onboard them in Admin Console and our companies SSO. Unfortunately the 7 interactions per month is too restricting. We feel it would be beneficial if there is a way to expand that interaction limit. The following are a couple of options Assign limited interactions to a group/team in Workfront instead of an individual. So it can be used across profiles depending on the external partners needs. Add the ability for clients to negotiate increasing the limit in their contracts. Maybe treat it as another tier with the licenses.
Description - Create the option to schedule a send announcementWhy is this feature important to you - This will help manage a consistent cadence of communication while delivering at the best time each week, even if I'm OOO.How would you like the feature to work - Schedule send just like outlookCurrent Behaviour - There is no option for this currently.
It would be super helpful if we could schedule a date / time for the announcement to be sent out. I often find that I am preparing a draft announcement, saving it and then having to go back at the exact time I want it to be sent out. For example, I may want an announcement to go out every Monday at 9am when users log on, but instead I have to do this manually.
Being able to use conditional formatting, specifically background/row colors, is very useful in reports. I want to be able to use this for GROUPINGS in a report so I can visually separate the groupings in reports where we have repeated groupings (like different groupings for different teams that may have more than 1 grouping). I don't want the rows within the grouping all a color because that can get busy, but really wish I can add background color to the grouping rows themselves.
When a report on a dashboard has over 200 records, the current UI doesn’t have the option of “Showing All” records. The “See more” link opens the report in a popup window but the windows size is too small to display just 3-5 rows at a time. We request to improve the UI to allow “Showing All” for reports on dashboards, as well as to increase the “See more” popup window to full browser size.
We use programs as a container with projects as a sub-container for types of work/documentation. It would be nice to be able to copy projects to another program or copy a program all together with the ability to remove issues/tasks/documents.
AEM as a Cloud Service "Copy Content" copies author-tier content only and intentionally strips replication-status metadata (cq:lastReplicated, cq:lastReplicationAction, cq:lastReplicatedBy, incl. the _publish/_preview variants). As a result, after a Prod→Stage copy the destination author has no record of what was published on the source, and nothing is published on the destination's publish tier.The only way teams can reproduce the source's published state today is to build external tooling that:1. queries the source (Prod) for the full activated set (e.g. via QueryBuilder), then2. re-replicates exactly that set on the target (Stage), chunk by chunk.This is inefficient by construction — it re-derives state the source environment already holds, it's bounded by QueryBuilder-over-HTTP result limits and request timeouts, and it doesn't scale to largerepositories (millions of nodes / multi-TB). We built and open-sourced such a tool to prove it works — https://github.com/rwunsch/aem-content-
Based on our rule, Person Score = Behavior Score + Demographic Score. However, based on what we’re seeing with the auto-merge action in Marketo, only the Person Score is being merged, while Behavior Score and Demographic Score are not merged individually.As a result, after the merge, the relationship no longer holds true—Behavior Score + Demographic Score ≠ Person Score.As a workaround, would it be possible for the system to also merge Behavior Score and Demographic Score separately during the merge process? This would help ensure consistency so that, from a reporting perspective, the expected logic remains intact:Behavior Score + Demographic Score = Person Score.
I recently had a very frustrating time trying to figure out how we could use delegations when people are away. I see a few have posted on this subject. Here’s my two cents worth. Current Method User goes to Workfront Home/Worklist page. Click Delegations. Enter a date range and delegate, Save. This creates a delegation for the user's tasks that have a Planned Completion Date in the specified date range. The delegate can now perform the delegated tasks, issues, approvals etc as long as they have the appropriate Access Level. Problems Delegation delegates specific tasks to the delegate rather than just allowing the delegate to perform any of the delegator's tasks during their absence. The delegated tasks are those with a Planned Completion Date in the specified date range. The Start Date of that range cannot be earlier than today. Any tasks with a Planned Completion Date before the start date cannot be delegated. These would be the oldest tasks the delegator has outstanding and thus t
A few months ago I built a Post-Purchase journey in Adobe Journey Optimizer that sent a personalised follow-up email based on what the customer bought. The journey had three branches — one each for Electronics, Sports, and HomeDecor — all tested, validated, and live.Then the business expanded into two new product categories: Grocery and Fashion. I updated the journey to add the two new branches and needed to validate them before re-publishing. The Problem with Test Mode To validate the Grocery and Fashion branches in Test Mode, I needed two new AEP test profiles — one with a Grocery purchase, one with a Fashion purchase. Creating new profiles in AEP is straightforward, but it takes time for them to reflect and become available for testing. I could not just create them and start immediately.With a deadline to re-publish the updated journey, waiting for two new profiles to propagate was time I did not have. Simulation Mode: New Users in Seconds I switched to Simulation Mode instead. I c
Problem Statement :How can we support near real-time or frequent audience evaluation in AEP, when the platform only allows one scheduled batch segmentation run per day and does not support sub-daily automation? Solution: In Adobe Experience Platform (AEP), batch segmentation is designed for daily execution (one run per day per sandbox). This becomes a challenge when business requires more frequent audience refresh (hourly or near real-time use cases).To handle this, AEP provides a combination of on-demand execution, optimization strategies, and alternative approaches. 1. Understand the Core LimitationOnly 1 automated batch run per day per sandbox No hourly or multiple recurring schedules supported Schedule timing (default 5:00 AM UTC) can be modified only via API, not UI👉 This means native batch segmentation cannot meet high-frequency use cases 2. Use Flexible Audience Evaluation (FAE) – On-Demand RunsTo overcome this limitation, AEP provides Flexible Audience Evaluation (FAE).✅ What
Hi Everyone,I wanted to share a new Chrome extension I’ve been using called TagScanner that has significantly streamlined my Adobe Tags (Launch) auditing workflow.As implementation scale increases, keeping track of library bloat and rule dependencies can get tricky. TagScanner helps by loading all details about any Adobe Tags property directly from the page.Key Features:Direct Page Reading: It reads the Tags library directly from the browser—no remote code or extra permissions required. Comprehensive Visibility: Quickly view all active Rules, Data Elements, and Extensions in a single interface. Performance Insights: It displays exact file sizes and usage details, making it much easier to identify "heavy" rules or unused code that might be slowing down your site. Effortless Documentation: Perfect for cleaning up legacy properties or creating implementation documentation for stakeholders.It’s been a great addition to my toolkit for quick audits without having to dig through the Data Coll
Workfront Fusion does not account for Daylight Savings Time, which is confusing when mangaging Scenarios and evaluating Cycles/Executions, especially because Workfront does account for DST.
The Monday morning that never ends Picture this: it's Monday, and Priya, a journey orchestration lead at a retail brand, has three journeys on her plate. A loyalty re-engagement flow. A trial-to-paid conversion path. A seasonal promotion for a new product line.Each journey needs the same opening move: read the audience, run an eligibility filter, and drop anyone who doesn't qualify. Priya has built that logic at least a dozen times. She knows it by heart. She also knows that if she copies it from an old journey, she'll spend the next hour untangling node references, fixing namespace mismatches, and wondering whether this version matches the one her colleague Marcus built last month.By Tuesday, she's still wiring up the same three nodes. Again.This is the quiet tax of journey building — not the creative work of designing a great customer experience, but the repetitive work of rebuilding logic your team already trusts. Journey Fragments exist to eliminate that tax. What if your best jour
Modern customer journeys rarely stay inside one system. They depend on loyalty platforms, billing engines, CRM tools, fulfilment services, and partner APIs. When one of those integrations fails, the reason behind the failure matters just as much as the failure itself.A temporary outage may need a retry. A duplicate request may need no action at all. A suspended account may require customer service intervention. But until now, custom actions in Adobe Journey Optimizer could detect that a call failed without giving journeys access to the structured error details many APIs already returned.AJO 26.1 changes that with Error Response Payload Support for custom actions. What's New: Error Response Payload Support Custom actions have long supported success response mapping. When an API call succeeds, you can define the response structure, parse the body, and use those fields later in the journey.Previously, error handling worked differently. If a custom action returned a 4xx or 5xx response, AJ
We would like to see some enhancements to milestone paths. Currently you can only associate one milestone path to a project. This creates limitations on enterprise-wide reporting. If we want a global milestone path associated to all projects, then agencies cannot apply a local milestone path to manage work. If leadership wants to see all projects across the enterprise for planning (revenue etc.) We currently have no mechanism to do that.
Already have an account? Login
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.