Hi, I think I saw previous posts about this item but wants to resurface it:
If I understand correctly, currently Workfront does not have the function to go back to a project plan previous version. You are able to see in the update section that what has been changed, and only the system admin is able to restore tasks for a project if that was deleted.
The current work around we are using is to download the project schedule at a determined frequency so we have something to compare to if there is a fairly large project and multiple PM is involved, and this is done manually. I was wondering:
1) Is there a way for setting up a automatic download for project schedule? If Workfront is not able to do it at this time, is there any potential macro that can be used?
2) From the community, do anyone else have better suggestion how you are handling similar issue (if you have encounter this)?
Thank you!