Your achievements

Level 1

0% to

Level 2

Tip /
Sign in

Sign in to Community

to gain points, level up, and earn exciting badges like the new
Bedrock Mission!

Learn more

View all

Sign in to view all badges

Scrum Sprint Goal should be listed at the top of the Iteration

Avatar

Level 2

13-05-2021

For SCRUM we fill out the goal on the iteration but it is not referenced on the Storyboard during the sprint. The idea of a goal is that it should be very visible during the sprint. Having this on the Sprint Board would be fantastic.