Current/Experienced Behavior: |
- The production deployment is completed.
- After the deployment, the customer discovered blocker issues on one of the 24 websites.
- They decided to roll back the deployment.
- They reverted the change that caused the issue and pushed the revised changes to Cloud Manager.
- They restarted the Stage/Prod build, which took 2 to 3 hours.
- The customer is trying to minimize this 2 to 3-hour downtime as much as possible.
The current production deployment pipeline is as follows:
-
1.Stage Deployment(77m)
-
2.Stage Testing(5m)
-
3.Production Deployment
|
Improved/Expected Behavior: |
The basic idea is an expedited deployment pipeline is a staged deployment after production deployment.
Since testing and code verification pipelines exist in QA or DEV pipelines and are verified by our deployment team, we believe that this task is unnecessary in production pipelines.
|
Customer-name/Organization name: |
LG Electronics, Global HQ Korea
24 subsidiaries (UK,DE,PE,TR,JP,FR,SG,CO,SA,SA_EN,CA_FR,CA_EN,KZ,ID,IT,CL,TH,PT,IN,HK,HK_EN,BR ,MX ,PA)
|