Expand my Community achievements bar.

Submissions are now open for the 2026 Adobe Experience Maker Awards.

Need functionality for expediting content sync from Production to Lower environments for smaller content sets

Avatar

Level 1

12/11/24

Request for Feature Enhancement (RFE) Summary:

Need functionality for expediting content sync from Production to Lower environments for smaller content sets

Use-case:

Currently, the available feature in Cloud Manager takes a long time to process content sync request(2-3 pages) from Production to lower environments.  Need functionality for expediting content sync from Production to Lower environment for smaller content sets

Current/Experienced Behavior: Even while moving 2-3 pages from PROD to a lower environment, it takes 45-50 minutes in Cloud Manager. There has been instances where moving 1 page takes an hour. Using CRXDE Package manager, this will take only 5 minutes while. Since this access is not given to Production Author instance, we will need a facility to expedite small content package sync from PROD to lower environment.
Improved/Expected Behavior:

Need functionality for expediting content sync from Production to Lower environment for smaller content sets

Environment Details (AEM version/service pack, any other specifics if applicable): 6.5
Customer-name/Organization name: Confidential
Screenshot (if applicable):  
Code package (if applicable):  
2 Comments

Avatar

Administrator

1/8/25

@RahulSa6 

Thanks for proposing this idea.
This has been reported to the engineering under the internal reference SITES-28078. The product team will triage this request to verify feasibility based on the prioritization model. This post will be updated according to Jira's status.
Status changed to: Investigating

Avatar

bdc
Employee

1/28/25

@RahulSa6 are you referring to the Self-Service Content Copy tool? If so, please message me with the Program and Environment ID - we'll have a look as it should definitely be much quicker than 45 minutes...