Explore product-specific spaces to ask questions, share insights, and learn best practices.
Recently active
When creating Custom Quarters you enter the start and end date (e.g. Q1 = 2/1 - 4/30). However, the system uses the beginning of each date as in 12:00am or 00:00:00 to run it's calculations (e.g. 2/1 00:00:00 - 4/30 00:00:00). So you will lose any activities that exist between 4/30 00:00:01 - 4/30 23:59:59). They will not count into the next Custom Quarter either as it would not start until 5/1 00:00:00. This can be worked around (but not resolved) by moving the Custom Quarter end for Q1 out by 1 (e.g. 2/1 00:00:00 - 5/1 00:00:00). Q2 start and end would then be 5/1 00:00:00 - 8/1 00:00:00 HOWEVER this creates an overlap 1) any task/project/hours/etc that occur on 5/1/2017 00:00:00 will be double counted as existing in both quarters 2) similarly, the information will be duplicately visualized when grouping by custom quarter So back to square one. The Idea: For Custom Quarter creation, since we cannot control the date/time, please force the end date of the range to always ref
If you have implemented DKIM in your organization, email notification sent by Workfront are quarantine as possible spoofing since WF does not support DKIM. This is not a nice to have. It is new technology that organizations are implementing to secure their system and we need WF to make this a priority.
It would be great to be able to move documents from the project level to the task level without duplication. Currently you have to move the piece from the main project tab to the task level by confirming the task #.
Please provide custom formatting capability in text mode for custom columns (valueexpressions). There are many times where using a custom field is not possible, but we still need to see data deltas and format the report based on the value of the calculation.
Use case: We have a team that works by picking a single work item at a time from their team view. They work a variety of tasks, and some need to be done as soon as they're ready, some as late as possible , and some that must be done on a specific day (we do use all of these task constraints)Currently in the team screen, there is no way to see these task contraints. Because of this, once the team gets to to a point where they can work ahead, the team can't distinguish the difference between the as late as possible and the must finish on tasks. This leads to the team having to "hunt and peck" for the as late as possible work items as it isn't possible for them to finish the must finish on tasks.A viable solution to this issue would be for the team screen to have custom views so we can pull in information that would let them be able to prioritize much more efficiently. This is just one of many use cases that the idea could be really useful for.Thanks for considering
We would like to be able to set up a task complete notification to be sent to a specific group (not related to the project) within the template. We are using the template every day to create a daily project so setting anything up at the project level is not effective.
I wish you could send mass test emails. Suggestion: the ability to send test emails from the program level, check a box next to each email in the program you would like to send as a test, and send all of those tests to the same internal person or people.
I have created activity with changes in CTA text (get offer changed to avail offer) on https://www.xyz.pqr page and I'm using page delivery option to deliver same experience on another two pages with goal "clicks on CTA". Currently, Adobe target provides click tracking of pages all together, which is difficult to under which page caused more conversion.To Avoid this I'll need to create three different activities to track clicks separately and conclude performance of each page which is time taking process.It will be very helpful if we get report of each page separately in single activity.
Please add a feature into ProofHQ where word documents can be edited in the ProofHQ system. As it is now, if a copywriter uploaded a word doc, a reviewer can make comments by marking the static, uneditable version of the document, just as one would make a comment on a designed PDF or JPEG. From a copyediting standpoint, it would be so helpful to have a feature that allows someone to edit the actual document--in the vein of "track changes" in microsoft word.
We wanted to compare current month-to date performance with the same dates last month.I.e. if today is 25-February'2020,this month to date would be 1-25 February'2020and previous month to day would be 1-25 January'2020.But when setting up end date condition to "End of current day minus 1 month" in custom date ranges, it does not seem to return the dates correctly (only the start date included)However, when creating a simple hit-level segment on this "Prev month to day" it seems to return the data impeccably and can be used instead in trend comparisons, calculated metrics, etc. I still do not know why that is but it works for any similar rolling dates, i.e.. Last year to day, etc.If anybody can recommend a better solution - please let me know.
Anytime a new report is created, the default metric "Occurrences" loads. Is there a way to set a default metric based on the report/dimension level?Many of my users use the activity map reporting in Analysis Workspace. They would like the default metric to be "Activity Map Instances". Is this possible?
Information is often missed in updates if the Workfront user making the update doesn't manually tag other users. When a person replies to an update that they have been tagged in, the original sender should be automatically tagged in their reply. For those users who work on more than one brand and/or team, the pace of work is so fast that it would increase the percentage of information that is automatically shared thereby increasing efficiency.
Generally I think marketo is a fantastic product, but the thing I'm finding really lets it down is its speed. Sometimes I do very basic queries and I have to go make a few cups of tea before it has run. Can I please request that you invest more in your servers and concentrate on getting the speed issue fixed. If you do this, you'll easily have the best product in the market (I've used alot of the others!)Cheers
It would be great to be able to view discussions, ideas, etc that I have initiated or in which I have participated.For example, I'm trying to find the solution that was recommended by a community member before the holidays, but the history does not go back far enough.
It would be great if there was a filter that allowed you to choose the progression status of leads in a particular program. I know that there is the "Progression Status was Changed" filter, but I find myself not getting the desired results from it. I want to be able to say show me the leads who are part of this program who do not have a progression status of Delivered.
The Email Performance Report is a great breakdown of total emails that go out within the date range in the setup. What would be great is an Email Performance Report with all the totals, but broken out per week.
It's nice that you can download and replace an HTML email, but it would also be nice to be able to download the text version of the email and be able to replace the text content version.
I just found out that the requirement for the standard Marketo fields: Acquisition Program and Acquisition Program Date are dependent on the contact filling out a form that is in the program, and a landing page that is in the program. All of our forms are in the design studio since we use the same form for many landing pages, which is best practice.I suggest that Marketo make the requirement for the acquisition program fields to be only dependant on the landing page that is a local asset in a program and any form fill.
Would it be possible to add html as a type of My Token? It would be great to utilize and access an html block for the updating of landing page lengths across multiple landing pages within one program due to content updates that are also being populated via My Tokens.For example, for a client's webinar series we offer 10+ landing pages (same content- different branding and tracking) due to separate partner sponsorships. It would be great to only have to update one html block to extend the length of all 10+ landing pages if a new webinar is added to the series, etc.
Hello,Unfortunately we had several issues when users mixed between 3AM and 3PM, so emails were sent at the wrong time :(I asked Marketo support to be able to change to 24H platform, and was shocked to be answered that Marketo DOES NOT support that.I think it's very important, mostly in AMEA, which is barely using AM/PM so often.
I want to be able to contact my leads via telephone and follow up with an e-mail, change their lead score ect. based on their response in the call. Is there an easy/ automated way to do this? For example, if they stay on the phone for a certain number of minutes, what is the easiest way to increase their score to reflect this?
I have emails that have a few links sometimes and it would be nice in the email reporting to see which links were clicked. Like if there was a way to tag a link as "link a" "link b" etc. I am not sure if this exists already
Only supports English, German and French languages, I request that you focus on improving your range of languages to support others, especially to deal with other European states and BRIC countries.
I feel the change in acquisition program and date data values is given and should take place in the background in any program. I have been manually placing these in the flow. I cannot think of a situation where I would not want to do this. Should I wish to remove this feature I think it makes sense to address that in the flow. Just a thought.Thanks!
I would love to have a dashboard inside Marketo that showed when all upcoming programs, email campaigns, events, automated drips, etc. were scheduled to run.As a digital marketer that is managing multiple global campaigns and processes at the same time, this would make life much better. It may not be as good as finding a golden ticket in a wonka bar but it would be a good start.
Already have an account? Login
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.