Build better products with our product team
It would be nice to have a template to create a program and all the projects within that program, as well as custom fields at the program level. This would be helpful for campaigns. We could remove the projects that are not applicable for the particular campaign. We could fill in the details for the campaign on the program level custom form. There is no capability to copy programs, so we aren't able to copy a similar program. It has to be all manually re-created.
Description - add option to change font colour in text in updates Why is this feature important to you - it would make it easier to selectively highlight important parts of the update How would you like the feature to work - at least basic selection of colours for the font, e.g. just like in reports, conditional formatting Current Behaviour - all black, only bold can be used as highlight
Description - Ability to map in non XDM compliant parquet files Why is this feature important to you - Source systems are not always producing parquet files which are xdm compliant How would you like the feature to work - Ability to map in parquet files from cloud based source connectors. Current Behaviour - No mapping option is present for parquet source files.
Description - When attempting to mark a Project Complete and there is an open issue or task, popup should at minimum list the task/issue stopping the project from being marked complete. Step better would be why the task/issue is not complete if due to missing approvals, bad dates, or anything else definable. Why is this feature important to you - Just wasted time trying to get close a project. First, all tasks were marked 100% and standard view does not include status so wasted time looking for a task not complete but 100%. Second, once the task was found I could not update the status because it was "Calculated by System", but all subtasks were complete and 100%. Waste more time looking through experience league for what could be stopping, try a number of suggestions with no results. Come to find out Planned start and end dates cannot be the same. Update dates to fixed because ASAP is not changing them. Still the parent task remains open. Thinking I have not found what is stopping the status update continue to waste time looking for more suggestions. Circle back to the dates and force time recalculation, things start working. Could have saved time if the popup notification just stated X task is not complete - Dates/Timeline error or message that is stopping the system. How would you like the feature to work - Keep the current popup when attempting to complete a project, but add details Current Behavior - Popup only states project cannot be marked complete with open tasks or issues.
Description - When sending a file from Workfront to Assets, the folder path should be "sticky" so that the next time we send a file we don't need to start from the very beginning of the folder path.Why is this feature important to you - This would save many clicks, reduce frustration, and improve efficiency.How would you like the feature to work - Similar to the way it works in the Enhanced Connector. The location of the last file send is the default for the next file send.Current Behaviour - When the User is sending a file to Assets, the user has to start from the very beginning of the Assets folder structure...every time.
Request for Feature Enhancement (RFE) Summary: Currently in AEM we have option to use Oauth2 (CQ Mailer SMTP OAuth2 Provider) for email integration with SMTP server, along with SMTP(Day CQ mail service) can we have option to use the Oauth2 with Microsoft graph API Use-case: Due to security reasons some clients won't enable the SMTP authentication for the accounts as those accounts are shared within multiple brands and SMTP AUTH is also being deprecated by Microsoft. So thinking to use the Microsoft graph API for email integration it will use the same access token generated using the Oauth OOTB implementation. Current/Experienced Behavior: Oauth2 integration with SMTP Improved/Expected Behavior: One more option to have Oauth2 integration with Microsoft Graph API Environment Details (AEM version/service pack, any other specifics if applicable): AEM cloud Customer-name/Organization name: Bounteous Screenshot (if applicable): Code package (if applicable):
Description - Allow using the "same field" custom field with "different labels" on various forms. Example below:Field Name: "Select Apps"Label 1 (Form 1): Select Affected AppsLabel 2 (Form 2): Select Top 3 AppsWhy is this feature important to you - Currently, the absence of this functionality leads to duplicate fields, increasing maintenance overhead. For instance, if the "Select Apps" field is a dropdown and I need to add two new values, I have to update every duplicate field individually, which can lead to errors if not updated.How would you like the feature to work - When adding a field to a custom form from the field library, the label should default to blank (or the initially set value). Either way, this should allow users to enter a different label if needed, without overwriting existing labels on other forms.Current Behaviour - If a label is modified on one form, it updates the labels across all forms using the field. This forces users to create duplicate fields and manage them separately.
Description:Parent task constraints in a template should yield the same results when applied to a project. Currently, this is not the case.Why is this feature important?If you need a specific phase of a project (with many child tasks) to start on a particular date, it makes sense to have the ability to set a start date for the entire group of tasks. Task constraints work as expected on parent tasks in projects, so it’s essential that a project template behaves the same way when creating a new project. Consistency between templates and projects is crucial for accurate task planning and scheduling. How would you like the feature to work?Parent task constraints in a template should function the same way they do in a project, ensuring that the template creates the project with consistent, expected results.Current Behavior:Some task constraints on parent tasks in templates are not respected when the template is used to create a project. For example, in a template, I have set a constraint on a parent task to start on day 5 (working days). However, when I create a project from the template, the task is pushed to day 10. With the project start date set to 2/4, a constraint for day 5 (working days) should set the task to 2/11, but it is instead set to 2/18. This discrepancy suggests a calculation error.Adobe’s response was that task constraints should not be applied to parent tasks. My counterpoint was: if that’s the case, then why is the option to apply constraints available in the first place? And, why does it work as expected when I apply it in a project? It also works on simple templates but seems to get confused on more complex templates. Adobe could not provide an explanation and reverted back to it's first response of not putting a task constraint on a parent task and to put in this idea. Anyone else having this issue?
We would like to understand what combination of events equal to what user actions via CJA Audit logs.The CJA Audit logs help doc https://experienceleague.adobe.com/en/docs/analytics-platform/using/cja-privacy/audit-log gives insights on very general things but we want to be able to get more specific information.For example: Project Created: Name = #### will that only show up once per project creation? Project Viewed will show up multiple times for a single view of a project(tested) or on a future date after the actual view. This makes it a bit challenging to extract precise usage insights.What are API_REQUEST? Why is there no User Name against some Action Name in the Audit logs? Description would show: Project Viewed: Project Objects - What are Project Objects?
We are looking to customize "Forward to Friend" feature in Marketo to have the following result, "When the email receiver forwards the received email from Marketo to a friend, the receiver should receive the email with a customized message in subject or in body of the email before forwarded email content"This customization is not currently not available, could you consider adding this in future developments
Description - I found community threads from 10 years back(?!) where people asking about lowercasing prop/evar values in processing rules. Till date, this still does not seem to be possible, correct? Why is this feature important to you - Why would I use processing rules if even this simple functionality does not exist? How would you like the feature to work - have an option to lowercase as string value as one of the given dropdown items Current Behaviour - still no can do in 2024
There are a couple of ideas out there for a better representation of this view in Smart Campaign Schedule: But I wanted to express again how confusing this line can be. 1. Email is operational. Blocked from emails doesn't account for that, but still lists all records which are unsubscribed or marketing suspended. That is not true: These people are in fact not blocked from that email.Also, it blurs the view on people who are really blocked, e.g. due to being email invalid.2. That line also appears if there isn't even a "Send Email" flow step in that Smart Campaign. It is also shown when the flow step e.g. is "Change Data Value" where there is no such thing as a block.I had to explain this misleading information to colleagues or clients countless times.
Description - There have been many times I'd love to share instructional text, or something to summarize a portion of a dashboard. Why is this feature important to you - It could help explain portions of the dashboard.How would you like the feature to work - Similarly to building a website, have the abillity to add a singular text box with bold, italic, underlines. Would also like the ability to add a link or graphic with the text.Current Behaviour - There's not a way to do that without creating a graphic, or some external link rigged way to get it to populate.
Description: Currently task approvals are only shown in the task view, but we regularly have projects stuck in task approvals that have gone unnoticed unless we hunt through tasks to see if it's stuck in an approval Why is this feature important to you: In order to keep projects on track, visually identifying approvals in the project timeline view would greatly improve our ability to monitor risks in our projects in the project timeline view. How would you like the feature to work?: Add some sort of visual queue that a task approval is pending approval in the timeline view without having to dig into tasks Current Behaviour: Approvals are only visible in the task view.
Description - It would be really nice if sections and custom fields edit and/or view capabilities could be controlled via a specific user, team, or group on a custom form. Why is this feature important to you - We are working on a way to have multiple people with edit permissions on a form be able to edit only one field or one section of a form, unique to each user/role, while the other fields and sections can either be only viewed or do not display at all. This is all based on the specific user that is viewing the form.How would you like the feature to work - This feature would allow us to control which sections or fields a specific user could edit or view. Different users would look at the form and for each user, a different section or field would be editable, view only, or wouldn't appear. This would greatly reduce the number of forms that we would need to create.Current Behaviour - You can set display logic based on field values in the form, but not based on user, team, group, etc. You can set edit and view permissions for a form based on which users have edit or view permissions for sections on a form, but it does not limit it based on user, team, or group.
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
OKSorry, our virus scanner detected that this file isn't safe to download.
OK