You should be able to do this at the project level with DATEDIFF, both in a report or a calculated field: ROUND(DATEDIFF({entryDate},{convertedOpTaskEntryDate}),2)
You should be able to do this at the project level with DATEDIFF, both in a report or a calculated field: ROUND(DATEDIFF({entryDate},{convertedOpTaskEntryDate}),2)