How to Sync Asset Metadata for Assets Uploaded in AEM First | Adobe Higher Education
Skip to main content
David_Fischer92
Level 3
April 29, 2024
질문

How to Sync Asset Metadata for Assets Uploaded in AEM First

  • April 29, 2024
  • 1 답변
  • 569 조회

We are switching from the enhanced connector to the native integration between AEM and Workfront.  Our process involves uploading assets in AEM rather than uploading them in Workfront.  So we are trying to somehow sync the metadata between AEM and workfront through the native integration for assets that are uploaded into AEM into a linked folder that exists in a project.  So we want to pull the project metadata into the assets in AEM without having to manually link each one or without having to upload the assets in workfront first.  Is there a strategy using Fusion or someway that we can accomplish this?

이 주제는 답변이 닫혔습니다.

1 답변

AleciaM1
Adobe Employee
Adobe Employee
May 14, 2024

Hi David, 

If you'd like, please consider submitting a ticket to support. We would be happy to take a closer look at this with you.