Your achievements

Level 1

0% to

Level 2

Tip /
Sign in

Sign in to Community

to gain points, level up, and earn exciting badges like the new
Bedrock Mission!

Learn more

View all

Sign in to view all badges

Jacob_T1
Jacob_T1
Offline

Badges

Badges
7

Accepted Solutions

Accepted Solutions
2

Likes

Likes
5

Posts

Posts
5

Discussions

Discussions
2

Questions

Questions
3

Ideas

Ideas
2

Blog Posts

Blog Posts
0
Top badges earned by Jacob_T1
Customize the badges you want to showcase on your profile
Re: Ensure Archived Target activities do not break reports in Adobe Analytics
Avatar
Boost 5
Level 2
Jacob_T1
Level 2

Likes

5 likes

Total Posts

5 posts

Correct reply

2 solutions
Top badges earned
Boost 5
Ignite 1
Give Back
Boost 3
Boost 1
View profile
Jacob_T1
- Adobe Target
+1 for this, we have encountered the same issue. Working around it by setting up our Workspace segments on the A4T dimensions using "starts with" operator rather than "equals"This way then the name changes it doesn't break the workspace when " (deactivated)" is appended to the Activity Name.

Views

10

Likes

0

Replies

0
Re: Hide trend line for future dates
Avatar
Boost 5
Level 2
Jacob_T1
Level 2

Likes

5 likes

Total Posts

5 posts

Correct reply

2 solutions
Top badges earned
Boost 5
Ignite 1
Give Back
Boost 3
Boost 1
View profile
Jacob_T1
- Adobe Analytics
Hi @lalitc72210912 You can achieve this result by changing your metric settings to "Interpret zeros as no value", which will hide the line visualization if you want to have a date range that goes into the future.However, some things to consider:Data for current day will change each time a user views the workspace, you could fix this with either a segment or calculated metric if this wasn't acceptable (i.e. exclude current day).If any data points in the historical data were zero, this would also ...

Views

199

Like

1

Replies

0
Re: How do I remove a scheduled report in Analytics?
Avatar
Boost 5
Level 2
Jacob_T1
Level 2

Likes

5 likes

Total Posts

5 posts

Correct reply

2 solutions
Top badges earned
Boost 5
Ignite 1
Give Back
Boost 3
Boost 1
View profile
Jacob_T1
- Adobe Analytics
Hi @anwatana You can manage all currently scheduled Workspace Projects via the Scheduled projects manager (Analytics > Components > Scheduled Projects). You can find more info on this page:https://docs.adobe.com/content/help/en/analytics/analyze/analysis-workspace/curate-share/schedule-projects.html Regards,Jacob

Views

3.4K

Likes

4

Replies

0
Migrate Launch Property from one Experience Cloud Org to another
Avatar
Boost 5
Level 2
Jacob_T1
Level 2

Likes

5 likes

Total Posts

5 posts

Correct reply

2 solutions
Top badges earned
Boost 5
Ignite 1
Give Back
Boost 3
Boost 1
View profile
Jacob_T1
- Adobe Experience Platform Data Collection
Hi all, I'm in the process of migrating all of our DTM properties to Launch, however have encountered a slight issue.We have 2 Experience Cloud Orgs for historical reasons, and 1 DTM property is running under the legacy Org. I know it is possible to Update this DTM Property to a Launch Property within the legacy Org, however is there a way for me to migrate this Property between Experience Cloud Orgs via an automated process. Either before or after a Launch Update. I realise that I could probabl...

Views

980

Likes

0

Replies

0
Re: Annotations (including Calendar Events) in Analysis Workspace
Avatar
Boost 5
Level 2
Jacob_T1
Level 2

Likes

5 likes

Total Posts

5 posts

Correct reply

2 solutions
Top badges earned
Boost 5
Ignite 1
Give Back
Boost 3
Boost 1
View profile
Jacob_T1
- Adobe Analytics
+1 for this, would be extremely useful to be able to annotate and add Calendar Events to Workspace reports.

Views

11.0K

Likes

0

Replies

0