Expand my Community achievements bar.

Radically easy to access on brand approved content for distribution and omnichannel performant delivery. AEM Assets Content Hub and Dynamic Media with OpenAPI capabilities is now GA.

how to change order of multiple checkboxes in flowed subform

Avatar

Level 1

Hi.

Am creating a form with rows of check boxes in a flowed sub form. I need to move check box 1 from the top of the sub form to below check box 7. I can not just drag it. i have been playing with livecycle for a while and have had wonderful help in the past from this forum members and  am hoping there is a simple answer out there.

thanks in advance for any help.

2 Replies

Avatar

Former Community Member

No need to drag it down. On the left hand side, in the Hierarchy, try to arrange the checkbox items in the order you want.

The one that is in the top will be displayed first. This will be effective and will not disturb other objects when we want to rearrange objects.

Regards,

Krishna

Avatar

Level 1

Thank you for the help. everytime i tried that it failed. but there was a

layout issue. i think. works now.