Is there a way of creating a calculated metric to give me the number of days between to events/evars.
For example i want to be able to see the number of days between when the customer gets a quote and their trip departure date.
So if they get a quote on 15/12/17 and their departure date is 20/12/17 the metric would populate with 5 days.
a) is this possible?
b) does it requite 'quote date' being in the datalayer?