Your achievements

Level 1

0% to

Level 2

Tip /
Sign in

Sign in to Community

to gain points, level up, and earn exciting badges like the new
BedrockMission!

Learn More

View all

Sign in to view all badges

Workspace: select allocation type

Avatar

Avatar
Validate 10
Level 6
psvlin
Level 6

Likes

141 likes

Total Posts

66 posts

Correct Reply

1 solution
Top badges earned
Validate 10
Validate 1
Boost 50
Boost 5
Boost 3
View profile

Avatar
Validate 10
Level 6
psvlin
Level 6

Likes

141 likes

Total Posts

66 posts

Correct Reply

1 solution
Top badges earned
Validate 10
Validate 1
Boost 50
Boost 5
Boost 3
View profile
psvlin
Level 6

13-03-2017

It would be nice to be able to select metric allocation in Workspace instead of having to create a calculated metric. An option like in Ad-hoc or adding it to the gear/options menu for a metric would be useful. 

 

Reference: https://marketing.adobe.com/resources/help/en_US/reference/reports_pages.html

1 Comment

Avatar

Avatar
Ignite 3
Moderator
jen_lasser
Moderator

Likes

113 likes

Total Posts

313 posts

Correct Reply

8 solutions
Top badges earned
Ignite 3
Ignite 1
Give Back 5
Give Back 3
Give Back 10
View profile

Avatar
Ignite 3
Moderator
jen_lasser
Moderator

Likes

113 likes

Total Posts

313 posts

Correct Reply

8 solutions
Top badges earned
Ignite 3
Ignite 1
Give Back 5
Give Back 3
Give Back 10
View profile
jen_lasser
Moderator

27-04-2017

Thanks for the feedback. This one is on our radar, we are discussing the right time & way to bring in this functionality given some other initiatives underway.