Hi all.
Trying to determine if it is possible to not have issues display on timesheets. We want 100% of time being entered to be entered onto the task, not the issue for the projects. Additionally, some people may have several dozens of issues at a time, and it would make the timesheet impossible to look at.
Any advice?