Expand my Community achievements bar.

Simon_ULe
Simon_ULe
Offline
Type
  • All
  • Questions
  • Discussions
  • Ideas
  • Blogs
Filter by user contributions
  • Description - In Classic, searching or entering a typeahead used to show matches by each keyword. In NWE, search and typeahead is by full string match. This is a difficult to use search method as users have to know the exactly string sequence to reduce the matches.   Please return the search/typeah...

    Type

    Ideas

    Views

    292

    Like

    1

    Replies

    1
  • Description - The current local search feature only searches within the current page showing. With a 2k record limit per page, if there are multiple pages of data, the local search does not work to filter the resulting list to just the matching search items. This mean the search is useless since I ...

    Type

    Ideas

    Views

    313

    Likes

    7

    Replies

    1
  • This is a backwards change from Workfront Classic, IMO. It used to be behave this way before. Not sure why they changed it to the current behavior.

    Type

    Ideas

    Views

    367

    Likes

    0

    Replies

    0
  • When sorting on a column, if the column width is reduced enough, the sort arrow can become hidden, which makes it difficult to recognize this situation. The arrow should either always be visible or the heading should be styled differently along with the sort direction arrow. For example, making the ...

    Type

    Ideas

    Views

    195

    Like

    1

    Replies

    0
  • Need to add page navigation capabilities using keys. Scrolling should be possible using arrow keys as well as page up/down keys. Currently, cursor keys or page up/down keys do not work for scrolling. Same thing with Home/End keys not working to move the cursor to beginning or end of input line.

    Type

    Ideas

    Views

    179

    Likes

    2

    Replies

    0
  • Currently, task commit dates can only be set by going into the task details view or the side panel. Many project owners need to track commit dates as well as planned completion date, without assigning the task, or even when assigned. Allowing the editing of the commit date directly from the project ...

    Type

    Ideas

    Views

    159

    Likes

    4

    Replies

    0
  • There is a need to report on task dates aggregated in a calendar view. There are 3 types of calendar view:A sequence of month/year (no day), a traditional calendar (the days per month per year), and the MS Project timeline view (the horizontal line segmented by dates).Please provide additional repor...

    Type

    Ideas

    Views

    152

    Likes

    2

    Replies

    0
  • I think the pinned menu concept is very nice, but the current interface allows for modifying/removing the pinned items too easy. A user can accidentally remove a pinned page or drag it to a different position because those options are always available.It would be better if the pinned items are in "r...

    Type

    Ideas

    Views

    168

    Like

    1

    Replies

    0
  • Currently, reports have filters defined that are usually fixed values such as project ID or project name. Then a dashboard is created to aggregate these reports for the same project ID/name.Instead of having to pre-define the project or whatever filter criteria per report, it would be helpful to hav...

    Type

    Ideas

    Views

    180

    Like

    1

    Replies

    0
  • Currently, there are project level templates that can be attached to an existing project, but this requires higher access to the project to leverage. In order to limit access, assignees only have permissions within their owned tasks. However, they cannot leverage templates because of this without ex...

    Type

    Ideas

    Views

    234

    Likes

    2

    Replies

    0
Top badges earned by Simon_ULe
Customize the badges you want to showcase on your profile