Hi, So I finally asked our implementation consultant (Thanks, @TCraig) The calculation needs to look like this: {project}.{DE:Story Lead:name} So she just added the :name to the end and it worked.
Hi, I need the value of a type ahead field that lives at the project level to populate a calculated field at the task level. Is this possible? Project Level = Story Lead (type ahead field.) I need this value to also live on a task under the project. I thought calculated field would be the way to go ...
Is there a limit on the number of job role IDs that can be included in the setRoleIDs field? Our integration requires that each person have 12 roles but when I try to import users with all 12 role IDs I get an error. It allowed me to upload with two but not 12. What is the limit here?