Hi all,
I'm trying to integrate AEM 6.3 with Target Premium. I'm following steps listed in Integrating with Adobe Target. I'm not using opt-in wizard but using Manual integration step. But I'm getting stuck while syncing the AEM Activities with Target. I'm getting these errors.

I have tried almost every option available but I'm not sure where it's going wrong. Can someone please guide?