Hmmm, I just looked and I appeared to be seeing the same thing. Then I realized there's a longer span of time on the project, so if you scroll the burndown to the right you should see the chart where the tasks are falling in the timeline. Just depends on how long your project is and how far it's spread out. If that's not it, then there's a bug we should probably report, because it's clear the space is there for the burndown. Vic Alejandro, PMP, CSM | IT | Sr. IT Project Manager Denver Water | t: (303-628-7262) | c: (303-319-6473) "http://www.denverwater.org/">