コミュニティアチーブメントバーを展開する。

The ability to create ideas and blogs are temporarily disabled. We apologize for the inconvenience.

Scrum Story Board - No cards for backlog

Avatar

Level 2

2021/04/16

Scrum Team Board - Setting a team as scrum vs Kanban removes the ability to see the backlog while in a card view. This makes it difficult during Sprint planning because you have to find each task in a grid view, then move them into an active or future Sprint (as opposed to just dragging them over from a backlog).

1件のコメント

Avatar

Level 2

2023/01/05

I would love to see the ability to drag and drop from the backlog into an iteration or from an iteration to the back log, and drag and drop between iterations!