GREAT TO HAVE STRETCHING OPTION OF TASK IN THE SCHEDULING AREA

Avatar

Level 9

22-11-2018

It would be great if we can stretch the tasl lenght which changes the dates in scheduling area for tasks. This will facilitate the task easily if the user is overloaded or planned mote than available. And the same change of date changes in the project plan too.