Is there any possible way to do it in workspace analysis? Since the metrics are to be fetched for each day of the quarter, with a 4 level drill down, it becomes time-consuming and repetitive manual task. Is there a better way to do this?
I want to create a report for a quarter.1) This should contain data for every day.2) For every date, the drill-down should be Dimension1>Dimension2>Dimension3 The challenge here is that it is very time-consuming to drill down 3 sublevels for 90 days. It has to be done manually every single day. Is t...