Your achievements

Level 1

0% to

Level 2

Tip /
Sign in

Sign in to Community

to gain points, level up, and earn exciting badges like the new
BedrockMission!

Learn More

View all

Sign in to view all badges

Copy Stage Report Suite Data to Prod

Avatar

Avatar
Validate 1
Level 1
joshm62283561
Level 1

Likes

2 likes

Total Posts

3 posts

Correct Reply

0 solutions
Top badges earned
Validate 1
Boost 1
View profile

Avatar
Validate 1
Level 1
joshm62283561
Level 1

Likes

2 likes

Total Posts

3 posts

Correct Reply

0 solutions
Top badges earned
Validate 1
Boost 1
View profile
joshm62283561
Level 1

19-05-2020

We had a tracking issue where the development embed script was mistakenly added to a particular section of our production site, so all the data exists in the stage report suite. I just need to backfill basic page view data with a few eVars (not looking to get time on page caught up, for example).

 

I need to copy it to production report suite, but not sure the best way to do this. I don't think data insertion API is right since we do not have timestamps enabled (or optional) in this RS, but I've never use data insertion.

 

Further, I'm thinking 'Full processing' via data sources API isn't appropriate as:
"Full processing data sources data is processed using separate visitor profiles, so even if the visitor ID in uploaded data matches data collected using JavaScript or other AppMeasurement library, the visitor profiles are not connected from an eVar allocation perspective"

 

Has anyone had to backfill prod data from a staging report suite?

Accepted Solutions (0)

Answers (2)

Answers (2)

Avatar

Avatar
Give Back
Employee
srola
Employee

Likes

10 likes

Total Posts

43 posts

Correct Reply

8 solutions
Top badges earned
Give Back
Boost 5
Boost 3
Boost 10
Boost 1
View profile

Avatar
Give Back
Employee
srola
Employee

Likes

10 likes

Total Posts

43 posts

Correct Reply

8 solutions
Top badges earned
Give Back
Boost 5
Boost 3
Boost 10
Boost 1
View profile
srola
Employee

02-06-2020

You may want to engage the Engineering Services via your Account Rep / CSM. The team will move your data as needed but it would be a paid engagement.

Avatar

Avatar
Establish
Level 4
KristiB1
Level 4

Likes

25 likes

Total Posts

86 posts

Correct Reply

23 solutions
Top badges earned
Establish
Boost 5
Boost 3
Boost 25
Boost 10
View profile

Avatar
Establish
Level 4
KristiB1
Level 4

Likes

25 likes

Total Posts

86 posts

Correct Reply

23 solutions
Top badges earned
Establish
Boost 5
Boost 3
Boost 25
Boost 10
View profile
KristiB1
Level 4

19-05-2020

I think you need to talk to your Adobe rep.  This is something they bmay be able to do in the backend.  I don't think it's possible to do yourself.