looking at the current project manager in adobe analytics i can see a lot of improvements. it currently looks like this:
![1289822_pastedImage_0.png 1289822_pastedImage_0.png](/t5/image/serverpage/image-id/21084i966D8C8AF57F4CBC/image-size/large?v=v2&px=999)
i would love to see the following improvements
- Schedules flag: projects with a schedule should have a sign/flag (maybe other colors for active, failed, expired)
- Metrics/Dimensions: columns with used metrics/dimension/segments within the project workspace
- Filter: Currently there are only "positive" filter, no way to "exclude" certain flags
would love to have more information within this list.