Data Extract: schedule a report for now and in the future at the same time

Avatar

Level 2

28-06-2010

It'd be great to have the capability in Data Extract (Site Catalyst) to not only schedule a report to be received now, but also to select an option to have the same report recurr.  Often I have to recreate the same data extract because I need the data now and also will need the same data in the future.