Your achievements

Level 1

0% to

Level 2

Tip /
Sign in

Sign in to Community

to gain points, level up, and earn exciting badges like the new
Bedrock Mission!

Learn more

View all

Sign in to view all badges

Ad-hoc: Only show calculated metrics for project report suite

Avatar

Avatar
Give Back 10
Level 6
psvlin
Level 6

Likes

152 likes

Total Posts

66 posts

Correct reply

1 solution
Top badges earned
Give Back 10
Ignite 10
Give Back 5
Ignite 5
Ignite 3
View profile

Avatar
Give Back 10
Level 6
psvlin
Level 6

Likes

152 likes

Total Posts

66 posts

Correct reply

1 solution
Top badges earned
Give Back 10
Ignite 10
Give Back 5
Ignite 5
Ignite 3
View profile
psvlin
Level 6

30-06-2015

Since calculated metrics are associated with one report suite, it doesn't make sense to show the calc metrics for other report suites, especially since each project can only have one report suite. It gets confusing to the end-user when they see two calc metrics of the same name but only one returns numbers.