Thanks for replying, Eric. Project > Billing Rates (tab) > New Billing Rate (button). This is where you can override a billing rate (by role) for a given project. [cid:image003.jpg@01D1CBCA.6D680160] In reports, I can get billing per hour for the job role, and the assigned user, and I can determine if the project has a billing rate override, but I cannot surface the override rate (or surface the “effective” billing rate based on if a project-override-rate is present) [cid:image004.jpg@01D1CBCA.6D680160] Cheers, Brandon