Document Folders in Tasks should roll up to project level

Avatar

Level 2

17-04-2020

When I create a folder in a task for documents, when it rolls up to the project level, it doesn't bring the folder with it. It just throws the documents in a list. Is there a way to do this?

1 Comment

Avatar

Level 2

08-05-2020

Alternately, I would like the option to flag a Task Folder and its contents so it stays in the tasks. If the writer needs source documents, those documents are really only relevant to the writer and the editor. If those docs are added at the task, even in a folder, they all jump to the Project level and clutter that list.