How to change order when tabbing through form fields?

Avatar

11-08-2008

Hi,

I'm turning an order form into a fillable (via Reader or Acrobat)form. There are roughly twenty-five lines with a field for; sku, quantity, description, amount, etc. I created the fields on line one and then propagated the lines below with the "place multiple fields" gizmo. So, While I can tab through the fields appropriately in the first line, At the next line and thereafter tabbing takes me down the column instead of across the row. Can I fix this? I realize that had I propagated fields individually in the first column I could then have used "place multiple fields" to complete the creation of the correct # of fields in each row. This would however, have caused a good deal of extra work resizing, renaming and justifying fields etc. for each line.

Hope you can help.



Aloha,

Hal

Replies