コミュニティアチーブメントバーを展開する。

Submissions are now open for the 2026 Adobe Experience Maker Awards.
解決済み

What are the best practices for generating critical path CSS

Avatar

Level 3

Hello, I was wondering if there are any recommended approaches for creating critical path CSS so your each page could use preloaded styles to render above the fold components on first paint? I have looked at some services and also some open source projects such as
https://github.com/pocketjoso/penthouse

 

I am wondering if there is a way one could generate the CSS as part of either the AEM workflow or in a continuous integration where you crawl the page and generate the CSS and then somehow install content package containing the critical path CSS. Make sure the headlibs sly tags use a page property to include that critical path CSS. Is there already some feature like this OOB that I have not seen?

トピック

トピックはコミュニティのコンテンツの分類に役立ち、関連コンテンツを発見する可能性を広げます。

1 受け入れられたソリューション

Avatar

正解者
Community Advisor

Hi,

You may have a look if this help https://github.com/dmantsevich/aem-critical-css

or inline css can be used https://experienceleague.adobe.com/en/docs/experience-manager-core-components/using/developing/inclu...

 

However CDN & clientlib caching pr defer(& async) load may help in faster loading of pages as well.

 

Thanks

元の投稿で解決策を見る

2 返信

Avatar

正解者
Community Advisor

Hi,

You may have a look if this help https://github.com/dmantsevich/aem-critical-css

or inline css can be used https://experienceleague.adobe.com/en/docs/experience-manager-core-components/using/developing/inclu...

 

However CDN & clientlib caching pr defer(& async) load may help in faster loading of pages as well.

 

Thanks

Avatar

Community Advisor

You can also try the below methods

 

  • Puppeteer: For crawling and simulating page rendering in headless browsers.
  • Webpack Plugins: Webpack plugins can be configured to generate critical CSS as part of your build process.
  • Store Critical CSS in AEM:

    • Once generated, the critical CSS can be uploaded to the DAM or stored as a client library in AEM. This allows you to manage the CSS within AEM and reference it in your components.