Hi,

I have one requirement where I need to run the scheduler on production through cron expression on publish but the problem is I have 4 Publish instances on 4 different servers. So If suppose publisher(P1) start the scheduler then at the same time other 3 will also start which creates the issue.

I cant run on author also as I have 2 author instances on production.

Can anyone please help me to resolve this story.

Thank a lot in advance.

Thanks Sumit 

1 Accepted Solution

Avatar

Correct answer by
Level 10
3 Replies

Avatar

Level 10

hi,

are those publish instance clustered?

which aem version u referring?

thanks

Avatar

Level 4
Currently I am not sure whether they are clustered or not. Please let me know if we make them clustered will resolve the issue and how. AEM 6.0 version Thank a lot for quick response. Thanks Sumit