I have an existing scheduled report.  If I make a change to that report, will the updated report be sent out or will it still be the original?  Basically, do I need to reschedule that report if I make changes to it's contents.

2 Replies

Avatar

Level 10

Assuming this is a Workspace report, the sent report will reflect the changes on the next send.