I’m only seeing the ability to control the right side panel via the settings in Setup > Interface > Layout Templates > Customize Home. We would like to have admin ability to customize the Work List on the left side as well. Specifically, we would like to be able to customize the sorting of the work list. We would prefer that the work list be sorted according to “Task Start Date” instead of “Task Completion Date”. The vast majority of our tasks span multiple days, so it would make more sense for us to be able to sort in the Work List by when the task needs to be started.

18 Comments

Avatar

Level 9

11/13/18

This is so needed. we need to be able to see planned vs committed. we cannot function without making sure they are seeing their tasks the correct date as the pm. this is a big miss. in the old home area we were able to get around this by adding in a custom layout template and included both planned vs commit. In this new area we cannot do this. we also do not have time to click in to every single task for every single person and check this. this is a big miss in my opinion.

Avatar

Level 1

3/27/20

We would also like to be able to add customize the left side work list with additional fields like a custom "priority" and to be able to sort by that field. This was possible with My Work.

Avatar

Level 1

7/1/20

An updated Home experience is in the design phase with a focus on development later in 2020. The new experience will include numerous options to customize the Home experience. If you would like a demo, please reach out to patrickmuir@workfront.com.

Avatar

Employee

1/18/21

Thank you for your feedback. We are looking at the overall strategy of the Home page and have added this to the list to re-visit as we work on that strategy to make the homepage more customizable. We appreciate the time you took to provide your feedback. Thanks, again!