Ability to lock a Project for Time Entry

  • March 29, 2018
  • 1 reply
  • 329 views

I would like the ability to lock a project (and all tasks/issues) so no one can bill any hours. This could be based on project status or an open for time entry flag.

1 reply

Level 4
November 19, 2019

If I'm not mistaken this is already possible to control on Project level in the System setup.