Build better products with our product team
"Proof failed to generate" - a Retry button. There should be a Retry button instead of re-uploading option only.
We would like to have color/highlights as a text menu option in the Updates tab. This should allow for highlighting text within the update to make it easier to see specific items. Example editor wants web team to make specific word changes, highlighting the words that need to be changed will make it easier for the web team to make the correct edit. Currently bold and italics can cause confusion of if the words need to be also bolded or italicized.
Description - When you are browsing a profile. And click on the segment membership tab. There's a list of segments there. If you are using some integrations or have an external segment like from AAM for example. Then you click on the segment and get an 'Oh Snap' page. Why is this feature important to you - I would like to be able to view these segments that are external to AEPHow would you like the feature to work - I would not expect an error page. Either do nothing or link perhaps back to an external tool like AAM for example where I could view more details on the external segment.Current Behaviour - Getting an error page. PLATIR-8228
The vast majority of our users do not approve timesheets yet are stuck with having the "Timesheets I Approve" button as an interface item. Allow me to hide this option via layout templates.
The "Report" Report is a great feature! We love being able to see how many views each report gets over time to see the usefulness of the reporting we build. The one features that is missing from this is calendars. We create so many calendars which our team members request that we would really like to see if they are being used in the same way the reports are. The features I am asking for is the ability to include calendars as a report type to see various data point on the same way you would a task or project report.
I would like for non-WF users to have access to fill out a request form.
I am recommending to add something similar to the Resource Planner that was just added to the Workload Balancer; add a setting to filter out tasks and issues/Requests that have been completed. I added this to my specific filter and found that for a specific team member the planned hours switched from over 2,000 hours for a month down to 200 hours for the month
The ability to upload PDFs with native Acrobat comments and convert those into native PHQ comments
Copy an existing proof workflow to use new proof – would like to be able to use an existing proof workflow and copy it over to start a completely new/separate route. This is a huge timesaver for all of us since we often use the same teams over and over again.
Currently there is no way to have timestamps added to custom fields, Only want to do this is to track the field, and then trying to pull this data is virtually impossible without longwinded text mode calculations. When would worldwide and having multiple teams working on projects then being able to track when items gets updated, and being able to use that data to then update other fields is a Gap. For example If you have a monthly project review, and expect a Monthly update on a project, there is no automatic way to check to see if that update has been updated in the last month or not without checking every project for a tracked field and if the date has been this month. Having a tick box on the custom field to say add time stamp, then being able to report and track that, you can automate a number of reminders, and also use to help automate a number of different areas, as you have a flag that provides a point in time that can easily be pulled and checked.
The license breakdown within system settings is a great addition. That said, many of our top-level groups are hierarchical. Ideally, I would like to have the ability to break down top-level groups by subgroup, setting license allotment per sub-group. (This will become more important as we continue to expand Workfront across the Enterprise.)
Ability to better track cycle time between statuses not just start of project to completion of project. Track when the status is changed on the issue/task/project and across multiple statuses to show if users are meeting the SLA KPIs
Product enhancement request for Adobe Target Recommendations: When modifying a Criteria sequence, it’s not possible to move the criteria’s around without deleting them and then re-adding them. Would it be possible to implement a drag and drop functionality so it is possible to move criteria #2 to position #1 without having to rebuild the whole sequence? Thank you!
Currently we can able to create folders for offers. It will be good if we get an option to create folders for audiences as well. So that we can segregate audiences easily based on the source of the audiences or based on the client's sites(If client using target for more than one site)
We are limited in the number of Workfront support contacts we can have so we spread them out across our Group Admins. It would be nice to allow our Workfront System Administrators access to Idea Exchange, instead of support contacts only, to see how others are handling obstacles, to post areas of opportunity they see as they manage the system for the entire organization, and to have an idea of upcoming, community-requested enhancements.
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.