Total hours by role in templates
I'm trying to get at total planned hours for each of the roles within my workflow templates. There doesn't seem to be a way to see this within the template itself, so I'm guessing I need to build a report?
I've tried building a Template Tasks report but can't seem to get at the information I need. Part of my issue is that for most of my tasks where multiple roles are assigned (e.g. Writer and Designer), the Planned Hours are not split 50/50. It might be more like 85% Writer and 15% Designer (these hour ratios are all set within the Assignments section of a task within the template).
I feel like I need the equivalent of an assignment-level report but at the template level, so I can get at something like "assignment >> workrequired" for the role instead of the task.
Can anyone point me in the right direction?




