Document Approvals and Proof Approvals
Within WF are Document Approvals and Proof Approvals considered the same when generating reports? We have two different ways that documents are approved. 1. Within a Project Task, using the Approvals option. 2. Accessing a document as a proof and approving it that way. Just curious if reporting captures them as the same metric, or are they considered two separate metrics on the back end?