コミュニティアチーブメントバーを展開する。

Submissions are now open for the 2026 Adobe Experience Maker Awards.

Mark Solution

この会話は、活動がないためロックされています。新しい投稿を作成してください。

解決済み

Tar PM online compaction AEM 6.1

Avatar

以前のコミュニティメンバー

Hi,

I have been working on Tar optimization on AEM 6.1. I remember from 5.6.1 that there was a setting in some xml (repository.xml or workspace.xml ) where you would set time between which every night the Tar optimization would run? Is that still relevant?

In the newest documentation about 6.1 , i think there is just a flag (pauseCompaction) that needs to be set to false. Now, I have set this flag to be false in the sling:OsgiConfig which is deployed with /apps in the project and within the install directory in crx-quickstart/install/org.apache.jackrabbit.oak.plugins.segment.SegmentNodeStoreService.config there is no entry of pauseCompaction. Would the tar compaction still happen overnight?

Also, what takes precedence settings in /apps or one that are loaded from crx-quickstart/install directory?

/crx-quickstart/install/org.apache.jackrabbit.oak.plugins.segment.SegmentNodeStoreService.cfg

pauseCompaction=false 

Finally, do we need to do anything for fileDataStorage?

Cheers

1 受け入れられたソリューション

Avatar

正解者
Employee Advisor
  1. Tar PM online compaction job in 6.1 is scheduled to run between 2:00 to 5:00 hours on daily basis. You can check the status of the last run and next run on the maintenance dashboard - http://localhost:4502/libs/granite/operations/content/maintenance/window.html/mnt/overlay/granite/o.... Also, if you want to see the configuration of the schedule in crxde then check the properties of the following node - /libs/granite/operations/config/maintenance/granite:daily 
     
  2. The precedence of osgi:config is followed as per below order- 
       1. Repository nodes under /apps/*/config....either with type sling:OsgiConfig or property files (CHECK)
       2. Repository nodes with type sling:OsgiConfig under /libs/*/config.... (ootb defns)
       3. Any .config files from <cq-installation-dir>/crx-quickstart/launchpad/config/.... on the local file system.
     
  3. If you are using external data store then you need to schedule the data store garbage collection job as it is not auto scheduled as Tar compaction. See the following link - https://docs.adobe.com/docs/en/aem/6-1/administer/operations/data-store-garbage-collection.html 

元の投稿で解決策を見る

3 返信

Avatar

正解者
Employee Advisor
  1. Tar PM online compaction job in 6.1 is scheduled to run between 2:00 to 5:00 hours on daily basis. You can check the status of the last run and next run on the maintenance dashboard - http://localhost:4502/libs/granite/operations/content/maintenance/window.html/mnt/overlay/granite/o.... Also, if you want to see the configuration of the schedule in crxde then check the properties of the following node - /libs/granite/operations/config/maintenance/granite:daily 
     
  2. The precedence of osgi:config is followed as per below order- 
       1. Repository nodes under /apps/*/config....either with type sling:OsgiConfig or property files (CHECK)
       2. Repository nodes with type sling:OsgiConfig under /libs/*/config.... (ootb defns)
       3. Any .config files from <cq-installation-dir>/crx-quickstart/launchpad/config/.... on the local file system.
     
  3. If you are using external data store then you need to schedule the data store garbage collection job as it is not auto scheduled as Tar compaction. See the following link - https://docs.adobe.com/docs/en/aem/6-1/administer/operations/data-store-garbage-collection.html 

Avatar

Administrator

Hi 

There is a knowledge Base article on Tar PM Optimization,

Link:- https://helpx.adobe.com/experience-manager/kb/TarPMOptimization.html

I hope this would help you.

Thanks and Regards

Kautuk Sahni



Kautuk Sahni

Avatar

以前のコミュニティメンバー

Thanks for the information. Cheers