Expand my Community achievements bar.

SOLVED

How to increase Max number of parallel workflows on Assets?

Avatar

Level 2

Hi Guys,

I've been trying to launch workflow on a folder in Assets which contains around 20 files. When I create a workflow post the selection, I get a error message saying that only max of 15 assets can be selected and that I have currently selected 20. We would like to increase this max number of workflows to more than 20.

I've tried changing the Maximum Parallel Jobs in both the Workflow Queues, Sling Jobs etc. but it just doesn't allow more than 15. Is there any other way to do this other than trying to configure the same in configMgr?

1 Accepted Solution

Avatar

Correct answer by
Level 2

Hi ,

This limit is added as property

you can change the limit in below property

/libs/dam/gui/content/assets/jcr:content/rails/timeline/granite:data

View solution in original post

5 Replies

Avatar

Level 2

Thanks Scott and Zeeshank for your response. The articles linked are the ones I'e tried and I had no luck. I configured the max parallel jobs in both external workflow Queue and workflow Queue. It has no effect. Also, instead of trying to increase the max jobs, I even tried to limit them by making it 10 instead of the default 15. Even this doesn't have any effect, the workflow starts for all 15 files even if the limit is set for 10.

I've tried configuring the limit in both Sling Jobs and even in configMgr with no luck.

Avatar

Correct answer by
Level 2

Hi ,

This limit is added as property

you can change the limit in below property

/libs/dam/gui/content/assets/jcr:content/rails/timeline/granite:data

Avatar

Level 3

Hi avinasht72984695​, therealsatz​ , smacdonald2008

After changing the value of 15 to 200 or any is there any performance issue have you face ?

If any please let me knew .Am also planing to change to 100 the same scenario.

Thanks in Advance!

-Karthi