CQ-Hybris Integration
Hi,
I am a beginner in CQ and I have to integrate CQ with Hybris. I have installed Hybris 5.1 and also installed CQ/AEM 5.6.1 without embedded hybris server because I already have hybris server installed. I have read number of documents about CQ-Hybris integration on Hybris Wiki as well as on http://dev.day.com/ site. But I am not getting clear idea on how hybris and CQ are communicating with each other. I have below queries about CQ-Hybris integration.
- How configuration is done? I understand that I don't have to do explicit configuration but I want to understand how it is done?
- Do I have to install CQ first and then the hybris suite? Does their sequence of installation really matters?
- Whether CQ pulls data from Hybris or Hybris can also pull data from CQ? Can you share some steps/guidelines to do that?
- As per note provided on link http://dev.day.com/docs/en/cq/current/ecommerce/eCommerce-hybris.html, hybris 5.1 is currently not supported. Is it still not supported or Hybris Connector is upgraded now to support hybris 5.1 version?
It will be really helpful If I get clarification on above doubts.
Thanks,
Manju