Hi

I found in MSM my live copy was attached the the wrong blue print.  Is there anyway i can detach it and re-attach it to the correct blueprint?  Or can i change its source page?

Thanks

This post is no longer active and is closed to new replies. Need help? Start a new post to ask your question.
Best answer by arunpatidar

You have to change the path in cq:master property  in cq:LiveSyncConfig

Those pages will have a cq:LiveSyncConfig child node of type cq:LiveCopy that will contain basic and mandatory information on the Livecopy through the following properties:

cq:master : points to the Blueprint page of the Livecopy
cq:rolloutConfigs : indicates active Rollout Configurations applied on the Livecopy
cq:isDeep : is true if the child pages of this root Livecopy page are included in the Livecopy.

5 replies

arunpatidar
Community Advisor
arunpatidarCommunity AdvisorAccepted solution
Community Advisor
June 26, 2019

You have to change the path in cq:master property  in cq:LiveSyncConfig

Those pages will have a cq:LiveSyncConfig child node of type cq:LiveCopy that will contain basic and mandatory information on the Livecopy through the following properties:

cq:master : points to the Blueprint page of the Livecopy
cq:rolloutConfigs : indicates active Rollout Configurations applied on the Livecopy
cq:isDeep : is true if the child pages of this root Livecopy page are included in the Livecopy.

Arun Patidar
arunpatidar
Community Advisor
Community Advisor
June 26, 2019

you can detach as well from page properties

Arun Patidar
key-key
key-keyAuthor
Level 4
June 26, 2019

this seemed to do the trick.  thanks a lot.

Level 3
September 11, 2020

@arunpatidar 

I have the same problem, 

I have two blueprints 

/content/enterprise_blueprint/en_US with one of the   /content/franchisee-au/en_US  live copy, there are others as well. This was detached, I applied the settings as you mentioned. I am able to see this live copy attached to blueprint

/content/enterprise_blueprint/el_GR with only one live copy /content/franchisee-gr/el_GR. This is detached, I applied the settings as you mentioned. I am still unable to see this live copy attached to blueprint

Are there any other settings that need to be change to make el_GR attached to its blueprint?

arunpatidar
Community Advisor
Community Advisor
September 11, 2020
What do you see if you check reference from master page? do see any live copy for the master page?
Arun Patidar
Level 3
September 11, 2020

I do see it is linked when I try to view properties from blueprint. When I do a rollout I see rollout failed.

com.day.cq.wcm.msm.impl.LiveRelationshipManagerImpl no relation for /content/franchisee-gr/el_GR/jcr:content found.
com.day.cq.wcm.msm.impl.commands.RolloutCommand Error during roll-out.
java.lang.NullPointerException: null
at com.day.cq.wcm.msm.impl.RolloutManagerImpl$RolloutSettings.fromRelationship(RolloutManagerImpl.java:1195) [com.day.cq.wcm.cq-msm-core:5.12.44]

In MSM control center, it still shows as detached with blue color, when I view relation ship details it shows it points to correct blueprint.