Your achievements

Level 1

0% to

Level 2

Tip /
Sign in

Sign in to Community

to gain points, level up, and earn exciting badges like the new
Bedrock Mission!

Learn more

View all

Sign in to view all badges

Workspace: select allocation type

Avatar

Avatar
Give Back 10
Level 6
psvlin
Level 6

Likes

152 likes

Total Posts

66 posts

Correct reply

1 solution
Top badges earned
Give Back 10
Ignite 10
Give Back 5
Ignite 5
Ignite 3
View profile

Avatar
Give Back 10
Level 6
psvlin
Level 6

Likes

152 likes

Total Posts

66 posts

Correct reply

1 solution
Top badges earned
Give Back 10
Ignite 10
Give Back 5
Ignite 5
Ignite 3
View profile
psvlin
Level 6

13-03-2017

It would be nice to be able to select metric allocation in Workspace instead of having to create a calculated metric. An option like in Ad-hoc or adding it to the gear/options menu for a metric would be useful. 

 

Reference: https://marketing.adobe.com/resources/help/en_US/reference/reports_pages.html

1 Comment

Avatar

Avatar
Validate 1
Moderator
jen_lasser
Moderator

Likes

119 likes

Total Posts

319 posts

Correct reply

8 solutions
Top badges earned
Validate 1
Give Back 25
Ignite 3
Ignite 1
Give Back 5
View profile

Avatar
Validate 1
Moderator
jen_lasser
Moderator

Likes

119 likes

Total Posts

319 posts

Correct reply

8 solutions
Top badges earned
Validate 1
Give Back 25
Ignite 3
Ignite 1
Give Back 5
View profile
jen_lasser
Moderator

27-04-2017

Thanks for the feedback. This one is on our radar, we are discussing the right time & way to bring in this functionality given some other initiatives underway.