Build better products with our product team
In the previous Requests page there was the option to see your recently completed requests. This has been removed from the new view. I utilized the view frequently to review the completed work. It would be helpful be able to create custom filters like you can everywhere else in WF.
When tasks are assigned - a notification is sent to the user - in Classic the notification included the project name - however in NWE - the task assignment is listed but it does not include a link to the project in the notification - so the user has to click inside the project to see the referenced task and to discern which project it belongs to - please add project name at minimum for issues and tasks assigned to users.
It would be very helpful if Regular Expressions were supported in Filters/Advanced Filters. The value of the filter function is severely reduced without RegEx support.To continue on the same train of thought, it would be great if it were possible to save filters once they've been updated on bookmarked reports. I find myself re-bookmarking reports after adding an extra filter parameter or two. If I miss re-bookmarking, then I need to re-add the new filter parameters next time I view the report.Thanks for your consideration of my input!
Right now, there are 4 different user roles within Target (Observer, Editor, Publisher, and Approver). The only role that can both create and change the state of activities within Target is the Approver role. However, with that role, the user is able to make changes to the Administration part of the UI, which can impact the setup for all users and can potentially cause problems. We have some users that we would want to be able to create and change the state of Target activities, but not make changes within the Administration section. At this point, we are not able to do that with the current roles. It would be helpful to have it set up in one of the following approaches:Create a new user role that would be a combination of Editor and PublishersCreate a new user role that would be an Approver-Lite that removes the ability to see the Administration sectionEnable a user to have multiple current roles per workspace/property
Cannot add swim lane rows to an agile storyboard, please consider adding this functionality. This image is what I would like to be able to replicate. Thank you!
The current system is able to manage two things: people within projects and roles of users.However, it is not possible to define a concrete project organization including users and their specific role in the project.We would like to have an option to depict the project team setup including the peoples role within a project.
Description - It would be helpful to have more information that can be provided when a feed fails. We are seeing a File Parsing Failed error. Did it happen on specific line? row? format issue? Any additional information would have saved our team a lot of time when trying to trouble shoot the error. Why is this feature important to you - it will save on the time it takes our technical resources in trouble shooting error that are presentedHow would you like the feature to work -Current Behaviour - generic error without any detail
I would like to have existing approval processes visible based on groups, similar to group-based statuses.
It is quite often when one or few line items have to be filtered off from the table. Creating a search filter manually takes time. It will a great time saver if it is possible to create a filter by selecting the line items, right click and add them to the filter as the search criteria. Scenario 1: There are 35 dimension items in the table and only few of them should be filtered off. The user selects those few lines, right click and selects add to filter as exclude that creates a filter "does not equal X AND does not equal Y AND etc." Scenario 2: There are 35 dimension items in the table and only 9 should be displayed for the report/ analysis. The user selects those lines, right click and selects add to filter as include that creates a filter "equals X AND equal Y AND etc."
Description - Show a tooltip in Bullet visualisations to report the value of that bullet.Why is this feature important to you - It is impossible to see the value that a bullet reports. Comparing it to the axis is impractical when reporting small values or values of high precision. Also, other visualisations have such tooltips, so why not bullets too?How would you like the feature to work - When mouseover a bullet (green portion), show a tooltip reporting the value. Similar to the tooltip shown in bar charts.Current Behaviour - Nothing happens when you mouseover a bullet.
In the task view of a project, we would find it valuable to be able to select a task and log hours in the summary panel for another owner rather than opening the task up, navigating to the hours section, changing the owner there and then logging the hours
Creating a segment that uses "starts with" rather than "equals" and having approximately 100 rules to set up this way on different dimensions, I'm really wishing I could change all of the "equals" at once!
Currently when I deactivate a user, I have to remember to unenroll the user from new experience first, then deactivate. Otherwise when I go to the Setup Menu/ New Experience/Enrolled Users column, I can still see users that have been deactivated and the count displayed is inacurate on how many users are in the new experience.
Allow for termination of a resource through SSO to manage attrition and team changes in an automated manner.
My team would like the ability to update documents without having to download the documents and then re-upload new versions. In SharePoint, we are able to check out a document, make an update, and then simply check the document back in. We never have to download a document to our personal desktops and then re-upload the docs to the server. My team would like to be able to do the same thing in WorkFront in order to make document updates easier to complete.
We have columns that display costs and expenses directly in the task list for a project, with a master parent task to summarize the totals.This gives our planners a quick, easy top-level summary of the budget considerations, including expenses. No need for separate reports, dashboards, etc.However, this relies on expenses being entered at the Task level. This works generally, but too often the planner doesn't realize they are not on a task when they enter an expense and it ends-up at the project level. These expenses can't be "seen" in the task list, causing a confusing discrepancy between these numbers and totals reported elsewhere.All I'm asking for is the simple ability to, like documents, being able to move the expense from the project level to a task.
Right now, the "Copy to" feature defaults to clearing only predecessors.I've had numerous requests to change that default to either all boxes checked, or simply some other combination of boxes.It's easy to make a mistake here and tedious when most users want all or most of the items cleared from a Copy.As SysAdmin, I should be able to modify this default.
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.