Skip to main content
Aug 25, 2022 9:45 PM UTC
Question

Allow extension of time limit for executions (increase scenario MAXIMUM EXECUTION TIMEOUT) Workfront Fusion

Please allow users to extend the 45 minutes max time for the execution of scenarios... I understand that it's good to have this limit in place as a default to save scenarios from looping. However, it would be very useful if it was possible to set this limit manually. It's a deal-breaker for us in regards to what we are trying to achieve with Adobe Workfront Fusion. The scenario we want to build requires more than 45 minutes, once in a while, and if we cannot allow for that, then we can't use Workfront.
Here's the error message we get when it happens:

 

  • Execution was requested to stop
  • Execution was requested to stop because MAXIMUM EXECUTION TIMEOUT [40 minutes] had elapsed

How can i resolve this bug?

This post is no longer active and is closed to new replies. Need help? Start a new post to ask your question.

5 replies

DavidCornwellLP
Level 3
Aug 25, 2022 11:29 PM UTC

I would firstly consider ways to make the processing more efficient. Secondly if it still takes longer than a single execution can run, you can likely break the work into smaller units that could be processed by successive executions.  Perhaps a data store could be useful as part of achieving this. 

Translate
andcamaAuthor
Aug 30, 2022 6:36 PM UTC

Thank you for the feedback @davidcornwelllp , I have a search module(GET) that gets about 20k to 60k records

what would you recommend to do more efficient this module?

 

Thanks

Translate
DavidCornwellLP
Level 3
Sep 10, 2022 12:11 AM UTC

Hi @andcama. I would consider breaking your process into two scenarios. In scenario 1, get it to write all the search results into a data store. In scenario 2 have it scheduled to run every 5 minutes and pick up a subset of the records (say 5000) from the data store and process them. Then the next execution will pick up another 5000 and so-on until they're all done. If you need any help implementing we can assist on a consulting basis.

 

Workfront and Fusion are a powerful combination so it's well worth persisting with.

 

All the best.

 

Regards, David 

Translate