Can I set a lag (type) on the first task of a project?
“Assign Design” is often the first task on a project.
We would like to set the default end date of all Assign Design tasks to a day of the week (Tuesday).
Is it possible to add a lag type to the first task of a project, utilizing “3w” somehow?
We would prefer to achieve this without having to add a task prior to “assign design”
If it’s not possible, I think we’ll have to ask our PM’s to manually set the duration to make that task end on a Tuesday each time they create a project.