Question
Changing "wait" step in an active campaign
I'm sure there are similar disucssions around this already, but I'm still at a loss with the best way to handle this. I have an active campaign curently on a "wait" step until April 3, 2013 @ 8:00AM. I need to change that wait step to a later date so that the next inviation is sent out on April 4th instead (since there is another email from a different campaign being sent out on the same day to several of the same customers). What is the best way to go about doing this? Can I just chang the wait step or do I need to stop/delete something?
Thanks in adavnce.

Thanks in adavnce.
