Bulk Future Activation Scheduling of Assets and Pages
AEM Community,
Hoping someone can point in the direction of some sort of tool within AEM (6.5) that can assist our team with bulk scheduling assets (images, documents) and site pages for future activations. We do use the activate later feature and can set that up asset by asset, page by page, but looking to see if there is a way to do this but at a bulk level.
Not sure if this can be done by using Projects in AEM, or Launches (though can't seem to figure out how to add assets to a Launch).
Appreciate any insights the community can provide!
Brian