Provide option for creating segments/calculated metrics at project-level when creating them inside a project | Community
Skip to main content
yuhuisg
Community Advisor
Community Advisor
November 15, 2021
New

Provide option for creating segments/calculated metrics at project-level when creating them inside a project

  • November 15, 2021
  • 2 replies
  • 1454 views

Description - Provide option for creating segments/calculated metrics at project-level when creating them inside a project

 

Why is this feature important to you - Having a lot of segments/calculated metrics at a user-level can make it difficult to manage them. Worse, when the user leaves the organisation, the user who gets these components transferred to will have even more segments/calculated metrics to deal with.

 

How would you like the feature to work - In the segment/calculated metric builder, include a checkbox to allow the created component to be at the project-level.

 

Current Behaviour - When creating a segment or calculated metric, the default behaviour is to create it at the user's level.

2 replies

Andrey_Osadchuk
Level 10
November 19, 2021

@yuhuisg , could you elaborate why the segment creation by clicking on the "+" icon in the panel is not an option?

 

 

 
yuhuisg
Community Advisor
yuhuisgCommunity AdvisorAuthor
Community Advisor
November 20, 2021

@andrey_osadchuk what I am thinking of is for this feature to always be available in the Segment/Calculated Metric builder. Currently, the checkbox, like the one you've pointed out, is only available when you create the Segment within the project (and likewise if you create a Calculated Metric within the project).

But once that checkbox has been checked, the Segment/Calculated Metric will only be available at the user-level, and there is no way to revert it back to project-level.

Or let's say I had created a Segment/Calculated Metric according to the normal workflow (i.e. by creating it via the left rail's "+" or inside the Components section in AA), then I cannot update it later to be project-level only.

After thinking about it further, I suppose this idea won't be taken up because it has the very high possibility of breaking other projects that rely on those same Segments/Calculated Metrics.