Your achievements

Level 1

0% to

Level 2

Tip /
Sign in

Sign in to Community

to gain points, level up, and earn exciting badges like the new
Bedrock Mission!

Learn more

View all

Sign in to view all badges

GregLo1
GregLo1
Offline

Badges

Badges
0

Accepted Solutions

Accepted Solutions
0

Likes Received

Likes Received
78

Posts

Posts
9

Discussions

Discussions
9

Questions

Questions
0

Ideas

Ideas
9

Blog Posts

Blog Posts
0
Top badges earned by GregLo1
Customize the badges you want to showcase on your profile
Enable Exporting of a Milestone Report - Workfront 17-04-2017
This is pretty simple. There's currently no way to export a milestone report like there is with other report views. I would love the ability to take a report using the Milestone view and export it into Excel.

Views

56

Likes

37

Replies

5
Enable expense approval functionality - Workfront 17-04-2017
Workfront provides the ability for a resource to add expenses and time simultaneously on the same screen to the same project, but the inability to natively approve expenses is an issue in our use-case.

Views

17

Likes

3

Replies

1
Enable a bulk-edit feature for hours - Workfront 17-04-2017
Enable a bulk-edit feature for hours, e.g. changing the hour type of several hours at once, or re-assigning hours from one project to another

Views

12

Likes

4

Replies

0
[CLOSED] - Allow a displayed date range to be specified when printing the Legacy Gantt - Workfront 17-04-2017
This post has been closed as a duplicate. All votes have been moved to the original: Gantt Export What I See algorithm If a project has an abnormally long duration, and the user only wants to "zoom in" on a particular date range in the output, there's no way to do this today. We need a way to specify a particular date range to display on the output when printing the Legacy Gantt.

Views

13

Like

1

Replies

1
Provide an overtime calculation on the timesheet instead of just a meaningless overtime box - Workfront 14-04-2017
There should be an adjustment to the timesheet or user's profile that allows a calculation of overtime for the user's timesheet, based based on the "schedule" applied to the user’s profile. For example, if the user's schedule indicates a M-F work week, then any time they indicate in the timesheet on a Saturday or Sunday gets included into the overtime calculation.

Views

19

Likes

11

Replies

3
Provide a workflow approval process for PTO - Workfront 14-04-2017
Provide a workflow approval process when a user indicates PTO, where the PTO requires approval by the user’s manager.

Views

16

Likes

9

Replies

1
Provide the ability to "categorize" PTO - Workfront 14-04-2017
Provide the ability to categorize PTO, perhaps using a drop-down adjacent to the date itself, and color-code the PTO dates based on the category. For example, I'd like to be able to distinguish between PTO associated to "Vacation" from PTO associated to "Training".

Views

11

Like

1

Replies

0
Add a "Select" checkbox to the groupings displayed in a report's results list - Workfront 14-04-2017
Add a “Select” checkbox to the blue grouping bars in a report, allowing the user to easily select all records in the report only under a particular grouping.

Views

10

Likes

7

Replies

0
Allow a "calculated column" to be added to a report which is a factor of values from other columns - Workfront 14-04-2017
Currently, there is no way to add a calculated column to the view that is a factor of values contained in other columns in the view (e.g. create a column “C”, that is equal to the value in “A” divided by the value in “B”)

Views

9

Likes

5

Replies

0