I have a dropdown menu with "codes" that equal our princing infoList
Item Value Given in Binding TabA-1 = .30A-2 = .60C-1 = .60And so on. The
issue is if I pick C-1 for a job, save the file and then re-open it. The
dropdown switches to A-2 which is the same price, but wrong code for the
job.Does each value have to be different for the dropdown to stick with
the right code? If I make each one different with a letter or something,
the price x qty calculation will not work to give me my totals.