Hi everbody,
I have two users assigned to a task with 100 %. One of them has a part time schedule, the other full time (I use user schedules instead of using FTEs). If I have a look at the Resource Planner the part time colleague is overbooked. When I assign him with 100% I don't want him to be ove...